Completed in 2008 by Oscar Renda Contracting, the 108-inch Water Transmission Line & Junction Structure, Lake Fork to Lake Tawakoni, Contract 5 project consisted of approximately 10,516 linear feet of various size pipe ranging from 108-inch to 60-inch. This project also consists of constructing a interconnect structure which required mass excavation and grading, structural concrete work and installation of large butterfly valves. In addition, construction of a CMU concrete building which included instrumentation, electrical, fencing and landscaping. Traffic control, barricades and flagging service for all work associated within the roadways.
Project Details
- Owner: City of Dallas
- Location: Rockwall, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $28,985,239.00
- Completion Date: December 2008