Hilltop Interceptor Contract G

Completed in 1990 by Mole Constructors, the Hilltop Interceptor Contract G project involved approximately 12,000 linear feet of tunneling, with Monolithic concrete lining. A modified Lovat 157-inch / 164-inch Tunnel Boring Machine was used for excavation through shale rock at depths ranging from 100 feet to 225 feet

Project Details

  • Owner: Northeast Ohio Regional Sewer District
  • Location: Cleveland, Ohio, United States
  • Performed as: Mole Constructors, Inc.
  • Project value: $16,100,000.00
  • Completion Date: 1990