Coffee Creek Water Resource Recovery Facility

OWNER: City of Edmond

ENGINEER: Carollo Engineers

SOUTHLAND HOLDINGS TEAM:  Oscar Renda Contracting

PROJECT HIGHLIGHTS:

The expansion of the Coffee Creek Water Resource Recovery Facility (CCWRRF) to 12 MGD is being constructed under continuous plant operation. Construction of new facilities and retrofitting existing facilities include:

  • Coffee Creek Lift Station
  • Excess Flow Holding Basin
  • Headworks
  • Selector Basin
  • Aeration Basins (converted oxidation ditches)/Aeration Basin Splitter Box
  • Blower Building
  • Secondary Clarifiers/Clarifier Splitter Box
  • Recycle Pump Station
  • Filters
  • Disinfection
  • Effluent Aeration and Pumping
  • Effluent Flume
  • Aerobic Digesters
  • Aerobic Digester Thickening Building
  • Aerobic Digester Control Building
  • Aerobic Digester Blower Building
  • Dewatering Building